| Rah AFzar Tarh
 Company overview
 Products
 Contents
 Training Videos
 Free Stuff
 Site Map
 Contact us
 Support services
 Home page
 | 
	|  |  |  
		|  |  
	| 
	Possibility to specify section legends when importing cross section points data in TotalStation format
	Calculation of area and length of ditches (brooks) in excavation condition as gutter area (GUTA) and gutter length (GUTL)
 |   |  
	| 
	 A new method for calculating gradient in a cross section as DeltaH/DeltaX useful in macro cost-estimate calculations
		  |  
	| 
	Possibility to export ground points coordinates as Generic format when "Full Reporting"	
	A new method for generation of new sections in pipe line projects based on crossings and References
	New items when printing or making DXF of longitudinal profile including points of minimum/maximum elevations, etc. |   |  
	|   
	Possibility to specify multiple ranges in "Batch Section Information" dialog box
	Possibility to categorize retaining walls in "Full Reporting" based on user-specified retaining wall heights using a new check box named Categorize
 |  	
	| Back to Top |  
	| 
	Possibility to include elevation of ground at center line when creating DXF of plan
	Possibility to copy calculated elevations of road's edges at left and right to "Rwleft elev" and "Rwright elev" in all profile types except "Extended highway" profile type
	Possibility to copy calculated devers of road at left and right to "Left fixed dever" and "Right fixed dever" in "Extended highway" profile type
 |   |  
	|   
	Possibility to trim ground points beyond a user-specified lateral limit in "Batch Section Information" dialog box
	Possibility to calculate costs of a project based on Macro cost-estimate values of year 1398
   |  
	|   | 
	Possibility to change whiteness of paper in CSDP-Books (Digital reference manual)
	A new method for calculating gradient of cross sections based on considerations in Macro cost-estimate named as "Macro-CE II" |  
	| 
	Possibility to erase constructed points oustside of the analyzed boundary using new items added in "Batch Section Information" dialog box
	Possibility to have plan x,y coordinates of different points of analyzed cross section in "Full Reporting" using a new check box named "Include plan XY"
 |   |  	
	| Back to Top |  
	| 		
	Possibility to calculate volumes based on a new formula in Cost-Estimate of year 1399 that actually is the formula for truncated pyramid (This formula can not be used in road volumetric calculations and it is not recommended)
   
	 About soil classifications based on new considerations in Cost-Estimate of year 1399 introducing 7 different types named as "Type I", "Type II", "Type III", "Type IV", "Type V", "Type VI", and "Type VII" as long as previous versions classifications as "Soft", "Hard", "Rock" and "XRock"
	Newly added items in "Total Quantities", "Manual Area", "Link to Excel", "Section Layout Text Items", "Displaying Results Settings", "Display Results", "Sections Optionals", and "Print Templates" dialog boxes with regarding to new soil classifications considerations
 |  
	| 
	Calculation of classified soil in seven groups besides Mud, named as CTI, CTII, CTIII, CTIV, CTV, CTVI, and CTVII as long as calculated items in previous versions named as CutS, CutH, CutR, and CutX
   
	New sections optionals named as MA, MB, MC, MD, ME, MF, MG, Ma, Mb, Mc, Md, Me, Mf, Mg for specifying depth/level and type of each soil classification layer for every cross section individually
	Displaying of different soil classification layers by dynamic hatches and also creating an XDH file having required data for static hatch patterns mentioned in Cost-Estimate of year 1399 for printing of cross sections
 |  |