            Calculation of the bruckner curve points by considering the cut and fill volumes, along with
				unsuitable cut volume, organic soil (vegetable soil) volume, and the volume due to the settlement of the soil after compaction
				Possibility to define up to 10 locations as the points of dumping or borrowing ground
				Possibility to define up to 20 lines of distribution
				Analysis and calculation of the carrying length of soil in categories of less than
				100 meters, 200m, 300m, 400m, 500m and more, and calculation of total average carrying lenght.
             |  
	| Back to Top |  | 
	
         Calculation of cut volume based on different types of soil(mud, soft, hard, and rock) using
			two methods of percentage, and depth
		Calculation of canal cut volume, based different types of soil(mud, soft, hard, roc, compacted)
			using two methods of percentage, and depth
		Calculation of extra canal cut volumes (extra costs), based on different types of soil
			(mud, soft, hard, rock, compacted) due to the canal depth, and water level
		Calculation of fill volume, based on normal fill area of section, along with stripping volume
			and settlement volume
		Calculation of items relevant to grading, leveling, regulating, trimming and lining of canal
			base and walls, edges of embankment, trenches etc. 
	 |  |